Primavera P6 Professional 8.4 / 15.2

Price: AED 1,900

Inquiry

Day 1

  • Introduction to project management concepts
  • Project management processes
  • Project knowledge areas
  • Prerequisites for project planning
  • Tips & tricks of planning & control

OBS (Organizational Breakdown Structure)

  • Different views
  • To create new OBS
  • Restrictions

EPS (Enterprise Project Structure)

  • Different views
  • To create new
  • Assigning the responsible manager
  • Difference between EPS & OBS

Projects

  • Overview of the project
  • Creation of new project through wizard
  • Creation of new project through details
  • Calendar global, resource, project
  • New calendar
  • Modification, copying holidays from global.
  • Making a project or resource calendar as global
  • Assigning a calendar as default for the projects

Activity Codes

  • Code definition
  • Assigning code and organizing
  • Reorganizing
  • Entering activities through wizard
  • Entering activities through details
  • Explore the use of duration format including sub unit mile stones, activity type
  • Inserting a new column
  • Moving the columns
  • Time scale adjustments
  • Different kind of relationship between tasks
  • Different methods of linking
  • Estimating the project finish date
  • Identifying the project critical path
  • Editing the task links
  • Applying different calendars to activities & estimating the finish date

Day 2

Constraints in a Project

  • Different types of constraints
  • Use of secondary constraint

Work Breakdown Structure (WBS)

  • What is WBS
  • Example for WBS
  • Defining WBS structure
  • Applying WBS for tasks

Weightage

  • WBS weightage
  • Activity weightage
  • Uses of weightage

Project Codes

  • Code definition
  • Assigning code and organizing
  • Reorganizing

Resource codes

  • Code definition
  • Assigning code and organizing
  • Reorganizing

Work Products & Documents

  • Defining WPS & docs
  • Difference between WPS & doc
  • Assigning it for activities Currency
  • To change the currency
  • To create new currency
  • Setting exchange rate
  • To find the cost of a project in another currency

Roles

  • Importance of roles
  • Defining the roles
  • Giving rates for the roles

Resource Sheet Preparation

  • Defining resource through wizard
  • Defining resource through detail
  • Defining resource through calendar
  • To create a new unit of measure for materials, which are not available in the list

Resource Assigning

  • Through add roles
  • Through add resources
  • Resources analysis
  • Resource usage profile
  • Resource usage spread sheet
  • Resource curves
  • Resource leveling
  • Cost loading
  • Concepts of stretching, crunching & splitting - manual automatic leveling
  • Thresholds
  • Issues management
  • Notebook topics
  • Steps
  • Feedback
  • Document control
  • Risk management in p6

Day 3

Updating Progress

  • Setting a baseline
  • Entering actual start & actual finish date for tasks
  • Updating through duration
  • Updating through physical complete
  • Updating through units
  • Updating cost
  • Comparative study of baseline and actual plan with variances
  • Preparing "s" curve and KPIS
  • Earned value analysis
  • Check-in
  • Check-out
  • Claims & extension of time using primavera
  • Filters
  • Global change
  • Tabular reports
  • Graphical reports
  • Import / export
  • Formatting bars
  • User defined fields
  • Templates / methodology management

Community Rating

Studied or Worked here? Share Your Review

Your email address will not be published. Required fields are marked *

Please do not post:

  • Aggressive or discriminatory language
  • Profanities (of any kind)
  • Trade secrets or confidential information

Thank you once again for doing your part to keep Edarabia the most trusted education source.

Similar Courses to Advance Your Career

Six Sigma Black Belt Upgrade
Six Sigma Black Belt Upgrade
  • SAR 5,995
Inquire
Six Sigma Green Belt
Six Sigma Green Belt
  • SAR 5,995
Inquire
MSP ® Foundation
MSP ® Foundation
  • SAR 7,995
Inquire
Project Management Professional (PMP)
Project Management Professional (PMP)
  • AED 12,856
Inquire
PMP (Project Management Professional)
PMP (Project Management Professional)
  • AED 3,000
Inquire