Manufacturing Process Executive Resume Template (CV Example)

KATHY TURNER

MANUFACTURING PROCESS EXECUTIVE

Location: 30000 George Lane | Houston, TX 78888 | Email: kathy@earthlink.net

Telephone: 555 555 5555  | Mobile: 444 444 4444

PROFESSIONAL PROFILE

A production supervisor with over 12 years of progressively managing worldwide capacity planning and supply chain optimization. I am accomplished in the use of optimization models to determine the least cost facilities and logistics while maximizing customer experience. I have superior leadership skills, which I have honed through practical professional experience in directing cross-functional global teams to design and deploy the best practices in manufacturing processes and operations. I am also an accomplished speaker and author with excellent interpersonal and communications skills, as well as a business acuity, even in Japanese.

CAREER HIGHLIGHTS

Osborne Computer Corporation, DALLAS, TX, Worldwide Operational Strategy, Director

1999 to PRESENT

Earned fast track promotions as a result of outstanding performances and constantly producing superior results. Delivered multi-million dollar cost savings through the development/deployment of corporate best practices in support of improved manufacturing processes.

RESPONSIBILITIES

  • Founded the group, Worldwide Operational Strategy, whose main mission and staff in the department was to provide worldwide Operations with global long-range capital capacity planning and supply chain optimization to determine next manufacturing sites within 3 regions (Americas, Europe, and Asia).
  • Using models for optimization, I performed careful analysis and worldwide roadmaps of the facilities, Procurement, Logistics organizations, and process design.
  • Acted as the manager to four teams, among which were involved in Quality, Capacity Planning, Process/Continuous Flow, and New Product Introduction.
  • Reduced capacity planning cycle time 38% from 39 to 24 days while increasing plan coverage to include in-bound and out-bound distribution capacity.
  • Reduced Depreciation/ Direct Labor/ Facilities CPB (cost per box) by 15% through the analysis and management of global production line and facility additions to increase manufacturing capacity.
  • Eliminated up to $761M in global supply chain and thus improved customer satisfaction through the leadership of three project teams using network optimization models to refine the Business Model.
  • Acquired i2 Supply Chain Strategist and Simulation Modules that effectively reduced optimization models runs from 30 hours to 7 seconds each.
  • Spear-headed cross-cultural worldwide operations team in the documentation of new procedures for Business Recovery that reduced recovery time for each facility up to 24 hours from 1-2 weeks.
  • Evaluated the feasibility for the new China manufacturing site, and in so doing, realized $420M in cost savings in the continuation of product service of the Japanese market through Malaysia factory.

Osborne Computer Corporation, Worldwide Process Technologies, Strategic Business Manager

1998 to 1999

RESPONSIBILITIES

  • On top of conceptualizing and developing various strategies, I also prepared business cases to provide cost reductions and improved manufacturing processes/productivity through the analysis of worldwide locations, facilities, and technologies.
  • Co-managed 90+ members in a cross-functional team of sales, operations, and logistics personnel.
  • Analyzed complete order fulfillment cycle and produced 56% cycle time reduction by applying continuous flow principles.
  • Conceptualized and designed a Phase Review Process for design projects creating a consistent and effective methodology.
  • Analyzed the proposed Workstation Manufacturing facility saving $880K through reuse of existing designs.

ACCOMPLISHMENTS

  • Awarded 1999 Productivity award for delivering $422M in cost savings.

Osborne Computer Corporation, Dimension, Product Engineering Manager

1996 to 1997

RESPONSIBILITIES

  • After promotion, I was tasked to oversee the complete engineering operations of the prolific line, the company’s consumer desktop model.
  • Functioned as the leader and manager of a staff of 9 engineers as well as technicians to support new product introductions of desktops, peripherals, BIOS, and Diagnostics into multiple factories.
  • As the leader of the group, I led it to become the first Line of Business to release the Design for Manufacturability guidelines which, in turn, offered Engineering practice with clear specifications to minimize factory changeover
  • Managed pilot lab, tool design, and machine shop areas, and prototype manufacturing process in support of all lines of business, including desktops, portables, and servers.
  • Established new cross-departmental product introduction metrics for benchmarking the development process.
  • Monitored performance in support of Continuous Improvement.
  • Restructured tool design and fabrication processes to reduce the documentation cycle from weeks to days.

Osborne Computer Corporation, Program Manager

1996 to 1996

RESPONSIBILITIES

  • Recruited into the firm to build infrastructure and document manufacturing processes for new product introductions.
  • Led new product introductions of the Preplex model, the company’s flagship corporate desktop product, in the Texas manufacturing facility.
  • Acted as the leader of a cross-functional team that consisted of personnel from product engineering, manufacturing engineering, operations, quality assurance, production control, test engineering, and electro-mechanical repair to develop corporate best practices for new product introductions into manufacturing.
  • Conceptualized a Manufacturing Readiness plan for the product launch, including a capacity plan and targeted performance metrics. I then collaborated with manufacturing, and engineering departments Produced final document in 2 months.
  • Tasked with the direction of all product development activities of junior engineers and technicians to meet all product launch deadlines.

 XYZ Company, DURHAM, NC,  President

1993 to 1996

RESPONSIBILITIES

  • Acted as the leader of a consulting firm whose main focus was to manage surface mount technology processes, and plated through-hole processes as a secondary objective.
  • Acquired clients including SMT Equipment Manufacturers Quad, MPM, and Centech as well as OEMs Lexmark, Genie, and Contract assembly houses.
  • Involved in the hands-on involvement in all areas, including sales, marketing, and accounting.
  • Assisted clients in improving SMT processes working with design and manufacturing engineers and contributing methods to improve design for manufacturability.
  • Prepared marketing analyses for client outlining competitors and products in specific SMT niche markets.
  • Co-authored the book entitled, “Surface Mount Technology Terms and Concepts”.

IBM, SUNNYVALE, CA, Manufacturing Engineer

1986 to 1993

RESPONSIBILITIES

  • Introduced new products and processes into Sunnyvale and Ireland manufacturing facilities.
  • Was tasked to support both the electro-mechanical and printed writing assembly manufacturing processes using JIT, DOE, and SPC principles.
  • Automated the electro-mechanical assembly process in a cleanroom environment using robotic work cells, reducing headcount requirement 65%, production space 40%, and scrap 20%.
  • Introduced CO2 laser marking of printed circuit boards, reducing labeling cost by 55% and total process cycle time by 10%.

EDUCATION & QUALIFICATIONS

Stanford University
Master’s degree in Industrial Engineering

Class of 1993

Attended Stanford University to pursue a Master’s degree in Industrial Engineering.

Arizona State University
Bachelor’s degree in Industrial Engineering

Class of 1990

I enrolled at Arizona State University, where I undertook a Bachelor’s degree in Industrial Engineering before taking a Master’s degree in the same.

CORE SKILLS

  • New Product Introductions
  • Process Development/ Improvements
  • Multi-Site Project Management
  • Design for Manufacturability
  • Process Development & Integration
  • Global Capacity Planning
  • High Volume Manufacturing
  • International Operations
  • Process Budgetary Planning
  • Performance Metrics
  • Lean Manufacturing
  • Supplier Qualification
  • Supply Chain Optimization
  • Phase Review Process
  • Product Launch Factory

LANGUAGES

English ♦ Arabic ♦ French ♦ Portuguese ♦ Italian ♦ Spanish

HOBBIES & INTERESTS

Writing ♦ Cycling ♦ Kayaking ♦ Reading ♦ Whitewater rafting ♦ Travelling

INDUSTRY REFERENCES

Mr. David Jones
Manager
Tel: 0161 334 7672 | Email: davidjones@gmail.com

Mr. David Adams
Manager
Tel: 0236 625 7572 | Email: davidadams@gmail.com

Tags

Related Articles

Add a Comment

Your email address will not be published. Required fields are marked *

Please do not post:

  • Aggressive or discriminatory language
  • Profanities (of any kind)
  • Trade secrets or confidential information

Thank you once again for doing your part to keep Edarabia the most trusted education source.